Skip to content

Experiential Design, Fabrication & Event Production NYC

Full-service experiential design and fabrication for agencies and brands. Design, build, and install — all in-house at our NYC shop. 200+ projects delivered. Zero missed open dates.

Brand Activations Trade Shows Pop-Up Shops Scenic Fabrication Stage Builds Experiential Design Immersive Production
Brand Activations Trade Shows Pop-Up Shops Scenic Fabrication Stage Builds Experiential Design Immersive Production
200+ Projects Delivered
0 Missed Open Dates
48hr Quote Turnaround
100% In-House Fabrication

Design. Build. Install. All In-House.

Pop Up Your Brand is a full-service experiential fabrication shop based in New York City. We design, engineer, fabricate, and install custom builds for brand activations, trade shows, pop-up shops, corporate events, and hospitality venues — all under one roof.

Our in-house capabilities span six fabrication disciplines: CNC cutting, scenic carpentry, metal fabrication and welding, scenic painting, large format printing, and LED lighting integration. From first concept sketch to on-site installation, one team owns your entire project — no subcontractors, no hand-offs, no surprises.

That full-pipeline control is how we’ve delivered 200+ projects with zero missed open dates. When your reputation is on the line and the doors open at a fixed time, you need a fabrication partner that controls every variable. That’s us.

Event fabrication shop interior with organized workstations

What We Build

Seven service categories. One team. Every capability in-house.

Experiential Design

Concept development, 3D visualization, spatial design, and fabrication-ready drawings — all engineered for buildability.

3D Rendering Spatial Design CAD Engineering
Learn More

Event Fabrication

CNC cutting, scenic carpentry, metal fabrication, painting, printing, and LED integration — six disciplines, one shop.

CNC Carpentry Metal Paint Print LED
Learn More

Brand Activations

Product launches, interactive installations, and photo moments engineered to stop crowds and drive social impressions.

Product Launches Interactive Photo Moments
Learn More

Trade Show Fabrication

Custom exhibits and modular booth systems designed to dominate the show floor and adapt to your full show calendar.

Custom Exhibits Modular Booths I&D
Learn More

Pop-Up Shop Design

Retail-grade pop-up environments that look permanent, install in a day, and tour to multiple markets.

Retail Pop-Ups Mobile Touring Fixtures
Learn More

Stage & Scenic

Custom stages, scenic walls, backdrops, and venue installations for events, hospitality, and live production.

Stages Backdrops Scenic Walls Venues
Learn More

We build what others render.

In-house design, fabrication, and installation — one team, one roof, one timeline.

WE

Why Brands & Agencies Choose PUYB

✦

All In-House

Design, CNC, carpentry, metal, paint, print, LED, and installation — all under one roof. No subcontractors means no finger-pointing, no schedule gaps, and no quality drift.

✦

Zero Missed Opens

200+ projects delivered and we have never missed an event open date. Not once. When the venue doors open at 6 PM sharp, our track record speaks for itself.

✦

48-Hour Quotes

Send us your brief, your renders, or a napkin sketch. We return a detailed, line-item quote within 48 hours. No competitor in this market matches that turnaround.

✦

NYC Shop, National Reach

We fabricate in our NYC shop and install nationwide. Las Vegas, LA, Miami, Chicago — our crew travels with every build for consistent quality at every venue.

Fabrication Partners for Agencies

A significant portion of our work comes through creative agencies, experiential agencies, and PR firms. We serve as the fabrication and production partner — you maintain the client relationship and creative direction, we own the build, the install, and the flawless execution.

We work white-label when needed. We meet your deadlines, your quality standards, and your client’s expectations — because our reputation depends on yours. When your client sees a flawless build on opening day, that reflects on your agency. We take that seriously.

Project manager and creative director reviewing 3D renders

Frequently Asked Questions

Let's build something worth talking about.

Quote in 48 hours. Design in a week. Build in 3-8 weeks. Zero missed open dates.

Start Your Project